top of page
Abcellera GMP Manufacturing Facility

Abcellera GMP Facility

About Project

Located in Vancouver’s False Creek Flats, AbCellera’s 100,000 sq. ft. manufacturing facility supports the company’s mission to advance antibody therapies into clinical trials. Designed by Chernoff Thompson Architects, the purpose-built facility includes laboratory space, 18,000 sq. ft. of offices, GMP-compliant biologics manufacturing areas, and integrated warehouse functions. Completed in 2024 after a four-year development process, the project strengthens Vancouver’s position as a growing biotech hub. DC Steel provided rebar installation, contributing to the delivery of this state-of-the-art life sciences facility.

Address

10 Evans Ave, Vancouver, BC

Date

2024

About Steel 1 (1).png

Get in Touch

Head Office

PO Box #327 407-552 Clarke Street, Coquitlam BC V3J 0A3

Employment

To apply for a job with DC Steel Ltd., please send a cover letter together with your resume to: info@dcsteel.ca

Inquiries

For any inquiries or questions please fill out the following form.

Thanks for submitting!

logo DC Steel
  • Instagram
  • Facebook

2026 © DC Steel Ltd. | All Rights Reserved

bottom of page